- 
                    Hold the new sill retainer up to the frame rail and ensure that the holes
                        line up correctly.
                    
                        Note: The front and rear sill retainers are not interchangeable.
                     
                    
                 
- 
                    If necessary, lower the vehicle to a comfortable working height.
                
 
- 
                    Place new barrel nuts in their proper location on top of the new sill
                        retainer.
                
 
                    
Note: The sill retainer should be on the inboard side of the brake rotor to
                        ensure that it is not bent or damaged during installation.
                    
                            
                                View large image
                                
                            
                        
                        
                    
                - 
                    Carefully push the new sill retainer into the frame rail towards the rear
                        of the vehicle until the holes are aligned.
                    
                
 
- 
                    Install rivets (x3) to secure the sill retainer to the frame rail.
                    
                        Tip: Have an assistant temporarily hold the sill retainer in
                            place with one of the other rivets while installing the first
                            rivet.
                     
                 
- 
                    Reinstall the rear wheel arch liner (refer to procedure).
                
 
- 
                    Install the HV Battery (refer to procedure).