Installation procedure is the reverse of removal, except
                    for the following:
            
            Caution: Lubricate new O-rings with clean
                    refrigerant oil.
          
         - 
               Use a mirror to inspect the O-rings on the charge port high/low pressure pipes. Replace
      the O-rings if necessary.
            
 
- 
               Recharge the refrigerant.