Installation procedure is the reverse of removal, except
for the following:Caution: Replace all nylon-insert
locknuts.
Caution: Replace all Patchbolt(s).
-
Ensure that the lower intermediate shaft to pinion markings align
correctly.
-
When reinstalling the bolts that secure the steering rack to the subframe,
follow this sequence:
-
Tighten the LH bolt to 30 Nm.
-
Tighten the RH bolt to 30 Nm.
-
Fully torque the LH bolt to 175 Nm.
-
Fully torque the RH bolt to 175 Nm.
-
Perform a full firmware update.
-
Run the "Power Steering (EPAS) Control" procedure in Toolbox.
Note: After recalibrating the power
steering, drive the vehicle for a minimum of 5 minutes before returning the
vehicle to the customer.